Along with a new coaching staff, Georgia is getting a new indoor athletic facility. Construction is currently in the demolition stage with E. Rutherford Street closed to allow crews to change the grade of the area that used to be the site of the grass practice fields.
At the same time, the Nalley Center (Georgia’s old indoor facility) is being razed to allow its footprint to be included in the new building.